PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing safety net around 4th Floor Facing South (800x600).jpg Installing steel angles and safety cables (1) Facing North-East (800x600).jpg Installing steel angles and safety cables (2) Facing North-East (800x600).jpg Layed out gravel at Cafeteria (104), and Main Loby (102). Facing East (800x600).jpg Metal decking at 4th Floor Facing East (800x600).jpg
Next page Installing safety net around 4th Floor Facing South (800x600)
Installing safety net around 4th Floor Facing South (800x600)